Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 4, 2024

October 4, 2024

No Information to Display

1110 Southwood St

Renovation

No Information to Display

$11,560.00

Public - County

img_map_placeholder

1110 Southwood St, Anderson, SC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Anderson School District Five would like to contract with a vendor to Provide and Install a 3 x 3 Hollywood Star in the Auditorium Floor at Southwood. See solicitation for details. Anderson School District Five would like to contract with a vendor to Provide and Install a 3' x 3' "Hollywood Star" in the Auditorium Floor at Southwood. See specifications below for details. The successful contractor shall assume all responsibilities associated with this contract including but not limited to all labor fees, federal, state, city or town required business license(s), permits, insurance, fuel, supplies and any other expenses required to carry out the requirement of this solicitation. The successful contractor shall be properly licensed (Section 40-11-30) and must have at least five (5) years of documented experience. The award will be to one (1) contractor. SPECIFICATIONS Location: Southwood Academy of the Arts 1. See example on page 4. 2. Contractor must provide a mock up with design, colors, materials, measurements, etc. 3. Hollywood Star should consist of Terrazzo with Brass Inlay for Star, Letters & Emblem 4. Contractor will be responsible for all base work, installation & clean up during & final clean up after installation. 5. Site visit is available upon request 6. All debris will be removed and all areas cleaned to original stat before final payments are submitted 7. Before leaving each day, site must be cleaned up and all trash disposed of off-site 8. All debris must be removed and disposed of off-site 9. All meetings require a prior notice of 24 business hours 10. No tobacco products of any kind on school grounds 24/7/365 11. Start Date: As soon as PO is issued 12. Completion Date: August 31, 2024 13. Contact: Dennis Kent at denniskent@anderson5.net or 864-844-3674 *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.