Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

November 1, 2024

October 15, 2025

Multiple Locations

Outdoor Lighting, Site Work

No Information to Display

$15,353,935.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Bezanson, AB

42

8

75

8

Subscribe to View Full Documents

GRADING, GRANULAR BASE COURSE, PORTLAND CEMENT CONCRETE PAVEMENT, ASPHALT CONCRETE PAVEMENT AND OTHER WORK 43:04 Roundabout at Hwy 43 and Hwy 733/670 (Bezanson) kilometre 25.480 to 26.790 670:02 Intersection Improvement at Jct. Hwy 670 and Twp. Rd. 722 kilometre 22.000 to 22.269 PEACE REGION APPROXIMATE QUANTITIES 4 565 cubic metres Asphalt Surfacing - Remove and Dispose 13 300 cubic metres Borrow Excavation - Contractor Supplied 19 000 cubic metres Waste Excavation 57 525 tonnes Supply of Aggregate - Dept. Source Option 39 000 tonnes Granular Base Course - Des. 2 Class 25 2 700 metres Cutting of Pavement 12 900 tonnes Asphalt Concrete Pavement - Mix Type H2 (PG 64-34) 5 600 tonnes Asphalt Concrete Pavement - Mix Type S3 (PG 58-34) 8 100 square metres Portland Cement Concrete Pavement 2 060 metres Concrete Curb (150 mm) 1 900 square metres Truck Apron Concrete 5 500 square metres Median Concrete Surfacing 2 326 metres Secondary Cable - Supply and Install 2 158 metres Underground Electrical Conduit - Supply and Install (Trenched) 118 metres Underground Electrical Conduit - Supply and Install (Pushed) 35 units Street Light Standard - Supply and Install 6 units Junction Box - Supply and Install 1 unit Temporary Lighting System - Supply, Install and Remove Contractor to supply all materials. Question Deadline 09/05/2024

100 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects