Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 21, 2024

January 19, 2025

E Charlotte Terrace & N Columbia Terr

Site Work

No Information to Display

$700,000.00

Public - City

img_map_placeholder

E Charlotte Terrace & N Columbia Terr, Mustang, OK

7

11

5

Subscribe to View Full Documents

The work to be covered under these contracts in accordance with the drawings listed herein and, in these specifications, consists of the furnishing of all materials, equipment, tools, labor, transportation and services necessary to complete the construction as outlined herein and as shown on the drawings. The complete installation shall not lack any part which can be reasonably implied as necessary to its proper functioning nor any subsidiary which is customarily furnished. Question Deadline 09/12/2024 Questions regarding documents, discrepancies, omissions, or intent of the specifications or drawings shall be submitted in writing to the OWNER through the ENGINEER at least seven (7) days prior to opening of bids. This project consists of furnishing all required materials, supplies, equipment, tools, and personnel to perform all necessary labor for the construction of East Charlotte Terrace Drainage. This project is eligible for sales tax exemption. Site Directions: Project Site Located at Intersection of East Charlotte Terrace and North Columbia Terrace. Description: The following description, while not intended to cover all details, outlines some items of the work to be accomplished under this Contract: 1. Install approximately, 114 LF of 8-inch dual HDPE pipe and 100 LF of 8-inch perforated HDPE pipe by trenching, including one (1) 8-inch inline drain basin and two (2) 12-inch drain basins. 2. Remove and replace existing grate immediately downstream of the detention pond headwall.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects