Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2024

November 4, 2024

May 31, 2025

To Be Determined

Site Work

No Information to Display

$905,000.00

Public - Federal

img_map_placeholder

To Be Determined, Afton, MN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Description: Please see statement of work for details. City: Afton County: Washington State/Province: MN Seeding of native grasses and forbs on approximately 34 acres at William O'Brien State Park. Broadcast or no-till drill are preferred methods. Example seed mix and seed rates are attached. A seed list, including origin of the seed, needs to be reviewed and approved prior to planting. Project location is on the west side of William O'Brien State Park and approximately 2 miles northwest of Marine on St. Croix, Washington County, MN. Site will be prepped by MN DNR in 2024 with soybeans to ensure weed suppression. The crop will be harvested in fall 2024, remaining stalks can be seeded into through the broadcast or no-till drill seeding methods. Seeding method and equipment planned to be used should be listed in your bid. To avoid rutting and other ground disturbance, work will be done with solid or frozen ground conditions depending on seeding method. Due to unpredictable winter weather/conditions, the timing of the work shall be discussed with the project manager prior to any work being completed. The Project Manager reserves the right to suspend operations due to unsuitable ground conditions resulting from significant precipitation events, warm weather, snow melt, or other unpredictable ground conditions

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects