Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 1, 2024

November 14, 2024

Koehler Rd

Site Work

No Information to Display

$206,229.00

Public - County

img_map_placeholder

Koehler Rd, Vadnais Heights, MN

59

5

10

7

Subscribe to View Full Documents

P6035 (CSAH 14) Ramsey County, through the Public Works Department, seeks construction bids for two separate drainage improvement projects to include Lambert Creek (Koehler Road) and Bald Eagle Boulevard/Avenue to replace the plastic pipes and structures with concrete pipes and structures and rebuild the embankment. Background Information The Kohler Road at Lambert Creek drainage project was chosen as a priority due to erosion, embankment slump, degradation of the plastic pipes and structures. This project will be performed in the City of Vadnais Heights, Minnesota where Lambert Creek crosses Kohler Road approximately 1300 feet West of Edgerton Street which includes: full road closure, excavation, drainage pipe and structure replacement slope improvement, erosion and sediment control, traffic management, pavement marking, and signing. The project is adjacent to and will outlet to Lambert Creek. The Bald Eagle Lake drainage project was chosen as a priority due to drainage pipe and structure upheaval and damage. This project will be performed in the City of Whitebear, Whitebear Township, Minnesota at the intersection of West Bald Eagle Blvd and Bald Eagle Ave which includes: full intersection closure, pedestrian and traffic management, excavation, drainage pipe and structure replacement, pavement re-construction, erosion and sediment control, pavement marking, and signing. The project is adjacent to and will outlet to Bald Eagle Lake. Contractor Questions Due: September 05, 2024. Protests shall be addressed to the Procurement Manager and emailed to ProcurementTeam@co.ramsey.mn.us. Addendum with Answers to Questions Issued: September 09, 2024. All questions concerning this solicitation shall be submitted in writing to the Procurement Specialist at the email address listed on the first page of this solicitation document. Addendum with Answers to Questions Issued: September 09, 2024. Anticipated Contract Start Date: October 01, 2024.

67 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects