Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 23, 2024

September 2, 2024

No Information to Display

720 Pleasant St

Renovation

No Information to Display

$23,400.00

Public - City

img_map_placeholder

720 Pleasant St, Southington, CT

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe to View Full Documents

Southington Public Schools seek proposals from qualified firms, contractors, or vendors to replace the sound system housed within and broadcasted from the athletic field's bleachers press box at Southington High School. The high school is located at 720 Pleasant Street, Southington, CT. The scope of work and specifications are listed below. Southington High School Athletic Field Sound System Proposal Specifications: 1) Proposers must attend the mandatory walk through and must design their proposal to function properly within the actual space of the Southington High School press box. No change orders or additions to proposals will be allowed. 2) After proposals are open, the scope of the project may be reduced, increased or otherwise adjusted due to budgetary constraints or other reasons. The Southington Schools reserves the right to accept or reject this RFP in whole or in part prior to the award. 3) All equipment furnished under this proposal shall be new. No refurbished equipment will be accepted. Equipment shall be good quality, and the brand names must be identified in the proposal. 4) After removal and approval by the Southington Schools personnel, the existing equipment must be removed and properly disposed of by the successful proposer. 5) The proposals shall include all necessary equipment, wiring, accessories, software, hardware, and for installation services. The proposal must also include training of Southington Schools personnel to install a fully functioning sound system for the high school athletic field. The system should be easy to use and to train users. 6) The proposals must result in an easy-to-use audio system fully scaled to meet the needs of the venue. The proposals must include all installation and programming for the system and equipment.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.