Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 12, 2024
March 15, 2025
December 31, 2025
SE Wildcat Mountain Dr
Paving, Site Work
No Information to Display
$1,284,180.00
Public - County
SE Wildcat Mountain Dr, Eagle Creek, OR
Clackamas County ("County") through its Board of County Commissioners is accepting sealed bids for the Wildcat Mountain Drive Paving Project ROAD #35001 Engineers Estimate: $1,480,900.00 Contact Information Procurement Process and Technical Questions: Tralee Whitley at Twhitley@clackamas.us Bid results will also be posted electronically listing shortly after the opening. To be eligible for award under this Invitation to Bid, bidders (prime contractors) must submit a prequalification application (either ODOT or County) to the County at least two business days prior to the Bid Closing. County will reject bids from bidders who are not prequalified for the class of work indicated prior to the Bid Closing. Bidders must be prequalified in Asphalt Concrete Paving (ACP), Temporary Traffic Control (TTC), and Pavement Markings (PAVE). Prevailing Wage Rates requirements apply to this Project because the maximum compensation for all Owner-contracted Work is more than $50,000. Contractor and all subcontractors shall comply with the provisions of ORS 279C.800 through 279C.870, relative to Prevailing Wage Rates. The Bureau of Labor and Industries (BOLI) wage rates and requirements set forth in the following BOLI booklet (and any listed amendments to that booklet), which are incorporated herein by reference, apply to the Work authorized under this Agreement: Prevailing Wage Rates for Public Works Contracts in Oregon, which can be obtained at online. The Work will take place in Clackamas County, Oregon. Clackamas County encourages bids from Minority, Women, and Emerging Small Businesses. Each Bid must be accompanied by either 1) a cashier's check or a certified check drawn on a bank authorized to do business in the State of Oregon, or 2) a Bid bond described hereinafter, executed in favor of the Owner, for an amount equal to ten percent (10%) of the total amount Bid as a guarantee that, if awarded the contract, the Bidder will execute the contract and provide a performance bond and payment bond as required. The successful Bidder's check or Bid bond will be retained until the Bidder has entered into a contract satisfactory to Owner and furnished a one hundred percent (100%) performance bond and one hundred percent (100%) payment bond. Question Deadline 08/26/2024 If any Bidder contemplating submitting a Bid for the proposed contract is in doubt as to the true meaning of any part of the plans, specifications or forms of contract documents, or detects discrepancies or omissions, such Bidder may submit to the Architect (read "Engineer" throughout in lieu of Architect as appropriate) a written request for an interpretation thereof at least ten (10) calendar days prior to the date set for the Bid Closing When a prospective Bidder seeks approval of a particular manufacturer's material, process or item of equal value, utility or merit other than that designated by the Architect in the Project Manual, the Bidder may submit to the Architect a written request for approval of such substitute at least ten (10) calendar days prior to the date set for the Bid Closing. The prospective Bidder submitting the request will be responsible for its prompt delivery. Acceptance or Rejection of Bids by Owner Unless all Bids are rejected, the Owner will award a contract based on the lowest responsive Bid from a responsible Bidder. If that Bidder does not execute the contract, it will be awarded to the next lowest responsible Bidder or Bidders in succession. The Owner reserves the right to reject all Bids and to waive minor informalities. The procedures for contract awards shall be in compliance with the provisions of the LCRB Rules in effect at that time. The Owner reserves the right to hold the Bid and Bid security of the three lowest Bidders for a period of thirty (30) calendar days from and after the time of Bid opening pending award of the contract. Following award of the contract the Bid security of the three lowest Bidders may be held twenty (20) calendar days pending execution of the contract. All other Bids will be rejected and Bid security will be returned. In determining the lowest Bidder, the Owner reserves the right to take into consideration any or all authorized base Bids as well as alternates or combinations indicated in the Bid Form. If no Bid has been accepted within thirty (30) calendar days after the opening of the Bids, each of the three lowest Bidders may withdraw the Bid submitted and request the return of the Bid security. Commencement Date: Upon Issuance of Notice to Proceed ("ntp") Substantial Completion Date: August 31, 2025 Final Completion Date: December 31, 2025 The liquidated damages for failure to complete the Work on time required by 00180.50(h) will be $800 per Calendar Day
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Beaverton, OR
Bid Date: Oct 03 2024
Bend, OR
Bid Date: Sep 11 2024
Boardman, OR
Bid Date: Sep 24 2024
Oak Grove, OR
Bid Date: Oct 16 2024
Astoria, OR
Bid Date: Sep 26 2024
Lebanon, OR
Bid Date: Oct 15 2024
Redmond, OR
Bid Date: Sep 27 2024
Nehalem, OR
Bid Date: Sep 26 2024
Gresham, OR
Bid Date: Oct 11 2024
Wood Village, OR
Bid Date: Oct 22 2024
Umatilla, OR
Bid Date: Sep 18 2024
Gresham, OR
Bid Date: Oct 02 2024
Westfir, OR
Bid Date: Sep 11 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
