Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 18, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$500,000.00

Public - County

img_map_placeholder

Multiple Locations, Decatur, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Water Meter Installation and Cul-de-Sac Renewal Program (Annual Contract With Four (4) Options To Renew) Questions Concerning the Project and Request for Interpretation of the Contract Must Be Submitted to the Department of Purchasing and Contracting in Writing via Email to Kyheem Bristol, Kbristol@dekalbcountyga.gov, No Later Than 5:00 P.m., August 23, 2024. the County Reserves the Right to Reject Any or All Proposals, to Waive Informalities in Bidding, and to Re-advertise. PROJECT OVERVIEW: Contractor shall provide the following services as listed below and defined in Attachment A, Scope of Services with Exhibits 1-7, attached hereto and included herein by reference, for each awarded Proposal Option. Secondary services shall be provided on an as needed basis as directed by the designated County Representative for the project. 1. Option A - Service Line Replacement & Cul-de-Sac Renewal a. The primary services to be provided for the Cul-de-Sac Renewal and Service Line Replacement Project are as follows: 1) All General Requirements 2) Cul-de-Sac Renewal 3) Service Line Replacement b. The secondary services to be provided for the Cul-de-Sac Renewal and Service Line Replacement Project, when directed, are as follows but are not limited to: 1) Assessment of Existing Site Conditions 2) Fire Hydrant Relocation and Placement 3) Water Meter Upgrade/Replacement 4) Radio Read Device (Transmitter) Installation (Retrofit Only) 5) Meter resetters Installation/Replacement 6) Meter Box/Lid Replacement 2. Option B - New Water Meter Installation a. The primary services to be provided for the New Water Meter Installation Project are as follows: 1) All General Requirements 2) New Water Meter Installation Mandatory DeKalb First LSBE Meeting: (Responders must attend 1 meeting on either of the dates listed.) Wednesday, August 14, 2024, or August 21, 2024 (Meetings are held at 10:00 a.m. and 2:00 p.m.)

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.