Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 14, 2024

No Information to Display

7361 Spanish Fort Blvd

Paving, Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

7361 Spanish Fort Blvd, Spanish Fort, AL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Performing construction required repave the community center parking lot, including milling, repaving, base repairs, striping, and other work incidental to the project. Thirty (30) working days are allowed for the construction of the project. All bids must be on blank forms provided in the specifications and submitted in its entirety. A cashier's check drawn on an Alabama bank or a bidder's bond, payable to City of Spanish Fort, for an amount not less than five percent (5%) of the amount bid, but in no event more than ten thousand dollars ($10,000.00), shall be filed with the bid, as a bid guaranty. The bidder's bond shall be prepared on the form specified and issued by a surety company authorized to do business in the State of Alabama. A performance bond in the form and terms approved by the City in an amount not less than the contract price will be required at the signing of the contract. A labor and materials bond in the form and terms approved by the City in an amount not less than the contract price, insuring payment for all labor and materials, shall also be required at the signing of the contract. In addition, the contractor must furnish to the City at the time of the signing of the contract a certificate of insurance coverage as provided in the specifications. The right is reserved to reject any and/or all bids and to waive informalities and to furnish any item of material or work to change the amount of said contract.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects