Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

January 20, 2025

No Information to Display

Dekalb Dr & Peeler Rd

Demolition, New Construction, Paving, Site Work

No Information to Display

$115,000.00

Public - City

img_map_placeholder

Dekalb Dr & Peeler Rd, Dunwoody, GA

8

4

10

3

Subscribe to View Full Documents

The owner has determined a prequalified list of construction managers. Brook Run Park Maintenance Facility Building and Grounds Vandermeer Management, LLC , on behalf of the City of Dunwoody is seeking Statements of Qualifications and Proposals from qualified General Contractors to provide preconstruction and construction management services for their Facilities Maintenance Building project at Brook Run Park. The project encompasses a +/- 8,400 SF two-floor facilities maintenance structure on a site of approximately +/- 1.0 acres located at the intersection of DeKalb Drive and Peeler Road at Brook Run Park. The existing brick structure, approximately 11,000 SF, is to be demolished and a new preengineered metal building structure is to be erected in its place. The first level of the new structure will be comprised of cast-in-place retaining walls and a CMU wall facing loading dock area. The second level will be comprised of a pre-engineered metal building. The new structure will contain loading docks, secured vendor storage, tool room with workbench, drive-in storage and toilet on the ground floor. Top floor will contain vendor and city official offices, breakroom with lockers, conference room, toilets, shower, storage room, IT and Mechanical rooms, and janitorial closets. A fenced parking encompasses parking for employees, material and equipment storage areas, dumpsters, fueling area with above ground tanks, heavy duty concrete paving, asphalt paving and striping. Site grading work will be required to include repair and new construction of retaining walls and installation of a bio-cell pond. Current electrical service is 3-phase 600A main panel with (4) sub-panels ranging from 100A- 225A. Upgrades to electrical service may be required. Value Engineer and design recommendations are encouraged based on the schematic design and narratives Preconstruction Phase Services. During the Preconstruction Phase, the Contractor will work cooperatively with Vandermeer Management to provide a guaranteed maximum price proposal for the project including any value engineering identified. The estimate is to be broken down by CSI division as indicated in the attached bid form. Construction Phase Services. The Construction Phase services will require the Contractor to execute the Project to be constructed pursuant to the Construction Documents and in accordance with the AIA GMP Contract and the Project Schedule. The Contractor shall be fully responsible for the means and methods of construction, Project safety and for Project completion within the Project Schedule Question Deadline 08/30/2024 at 12:00 PM ET Request for Information Questions due from Contractors to Owner Project Manager . Issue responses to questions/requests for clarifications 9/10/24 The anticipated start date of construction is February 2024, contingent upon permit receipt and material procurement. A detailed schedule will be required by the General Contractor as part of the RFP response deliverables. In addition to the overall project schedule a site logistics plan is recommended. The Project Manager reserves the right to adjust the schedule as the Owner and/or the Project Manager deem necessary

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.