Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 27, 2024

September 26, 2024

No Information to Display

3740 Tolt Ave

Paving, Site Work

No Information to Display

$170,284.00

Public - City

img_map_placeholder

3740 Tolt Ave, Carnation, WA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The City of Carnation requests sealed bid proposals for construction of the Tolt Middle School Sidewalk Improvements. Improvements along Tolt Avenue, in front of Tolt Middle School, include removal of trees, HMA sidewalk, and curb ramps, and reinstallation of cement conc. sidewalk, curb and gutter, tree installation, storm conveyance revisions, restoration and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. The engineer's construction estimate range for this Project is $140,000 to $180,000. Tune for project completed shall be in accordance with Section 1-08.5 of the Standard Specification and as amended by the Special Provisions All bod proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent. (5%) of the amount of such bid proposal. Should the successful hid der fail to enter into such contract and furnish a satisfactory performance bond within the time stated in the contract documented, the had proposal deposit shall be fur feited to the City of Carnation. No bidder may withdraw their bud proposal after the time fixed for opening thereof of before award of the contract, unless said award is delayed for a period exceeding thirty (30) days. The City of Carnation reserves the right to reject any or all bide, and to waive minor irregularities in the ladding process. Any prospective Bidder desiring an explanation or interpretation of the Bid Documents, shall request in writing by the close of business five (5) business days preceding the bid opening. Oral explanations, interpretations, or instructions given by anyone before the Award of Contract will not be binding on the City of Carnation. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.