Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 17, 2024

November 18, 2024

October 31, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$1,493,000.00

Public - Federal

img_map_placeholder

Multiple Locations, Larsen Bay, AK

78

24

7

5

Subscribe to View Full Documents

Work of the Project includes: Development of a gravel source for pipeline bedding and road repairs or importation of required project materials. Phase 1A: construct the water main with all valves and appurtenances from Station 0+00 to 7+60 and provide water service connections for 8 homes. Phase 1B: construct the water main with all valves and appurtenances from Station 104+15 to 110+62 and provide water service connections for 3 homes. Phase 1A Additive Alternate: construct the water main with all valves and appurtenances from Station 7+60 to 10+46. Phase 1B Additive Alternate: construct the water with all valves and appurtenances from Station 100+00 to 104+15 and provide water service connections for 1 home, and 2 stubouts. The Project has an expected substantial completion date of 30 September 2025 and final completion date of 31 October 2025. Owner anticipates that the Work's total bid price will be approximately $3,000,000 - $4,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. IFB #ANTHC 25-B-321525 The funding source for this project has required bids to be acquired before full funding will be provided. This review will add approximately 2-3 weeks to the review process. The Project includes the following Work: Work of the Project includes: Development of a gravel source for pipeline bedding and road repairs or importation of required project materials. Phase 1A: construct the water main with all valves and appurtenances from Station 0+00 to 7+60 and provide water service connections for 8 homes. Phase 1B: construct the water main with all valves and appurtenances from Station 104+15 to 110+62 and provide water service connections for 3 homes. Phase 1A Additive Alternate: construct the water main with all valves and appurtenances from Station 7+60 to 10+46. Phase 1B Additive Alternate: construct the water with all valves and appurtenances from Station 100+00 to 104+15 and provide water service connections for 1 home, and 2 stubouts. The Contractor shall furnish all labor, materials, equipment, tools, services, testing, and incidentals to complete all Work required by these Specifications and as shown on the Drawings and shall have experience with water service systems. Estimated Cost Range: Owner anticipates that the Work's total bid price will be approximately $3,000,000 - $4,000,000 Question Deadline 08/29/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Contracting Officer in writing through the Bonfire portal. Contact information and submittal procedures for such questions are as follows: A. Questions must be submitted seven calendar days before the bid opening date. Inquiries received after this time frame may not receive a response. Question period extended to 9/9/2024

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.