Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 13, 2024

October 14, 2024

May 8, 2025

Multiple Locations

Renovation, Site Work

No Information to Display

$1,121,992.00

Public - City

img_map_placeholder

Multiple Locations, Texas City, TX

33

20

22

7

Subscribe to View Full Documents

Estimate: 1,000,000. Question Deadline 09/02/2024 Submit questions about bidding documents to the Engineer/Professional. Inquiries are permitted until ninety-six (96) hours prior to bid opening. Online - Q&A Work of the contract includes: Base Bid for Lift Station 7 Includes: The scope of work will be to rehabilitate the lift station, while keeping the existing wet well basin intact. All new submersible pumps, hardware, piping, and slabs will be installed and a new electric service by Texas New Mexico Power (TNMP) will be provided. The new electric service at Lift Station No. 7 will also include the necessary switchgear to meet service standards including a manual transfer switch for connection to a portable generator, if necessary. The existing fence will be replaced and the interior of the lift station site will be paved. Base Bid for Lift Station 15 Includes: The scope of work will be to rehabilitate the lift station, while keeping the existing wet well basin intact. All new submersible pumps, control panel, hardware, piping, and fencing will be installed. The interior of the lift station site will be paved and a new automatic transfer switch will be installed to be used with the existing generator on site. It is the sole responsibility of the bidder to ensure that his bid is actually in the Public Works Purchasing office prior to the expiration of the time and date above first written. Bid security in the amount of five (5) percent of the greatest amount bid must accompany each bid. It shall be each bidder is sole responsibility to inspect the site of the work and to inform himself regarding all local conditions under which the work is to be done. TIME AND ORDER FOR COMPLETION The construction covered by the contract documents shall commence within ten (10) days after written Notice to Proceed shall have been given by Professional and be completed within 210 calendar days from the date specified in the Notice to Proceed. Upon consideration of the proposals the City Commission plans to award a Contract; however the Owner reserves the right to reject any and all bids, to waive any and all formalities and technicalities, and to accept any bid which it deems advantageous to the owner. Each bidder agrees to waive any claim it has or may have against the Owner, the Engineer, and their respective employees, arising out of or in connection with the administration, evaluation or recommendation of any bid. The successful bidder will be required to furnish a performance bond and payment bond in an amount of 100% of the total contract price.

79 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.