Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 3, 2024

October 3, 2024

February 28, 2025

Multiple Locations

Site Work

No Information to Display

$167,930.00

Public - City

img_map_placeholder

Multiple Locations, Middleton, ID

8

11

3

Subscribe to View Full Documents

This project will consist of furnishing all labor, materials, equipment, and supplies to rehabilitate four segments of the City's sanitary sewer collection system by installing cured-in place pipe (CIPP). Question Deadline 08/23/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than ten days prior to the date for opening of Bids may not be answered. Work includes limited traffic control, accommodations for and coordination with system users, bypass pumping, and reinstating service/lateral connections as depicted on the project plans and specifications. All work, materials and installation shall be in accordance with the project plans, specifications, Idaho Standards for Public Works Construction and Middleton Supplemental to ISPWC. The project is not subject to Davis Bacon or Buy American requirements. Engineer's estimate $166,000 - $212,000 All bids shall be submitted on the prescribed bid form and in the manner indicated in the Instructions to Bidders. The City of Middleton reserves the right to accept the bids and award a contract to the lowest responsible bidder based on the base bid schedule; to postpone the acceptance of the bid and the award of the contract for a period not to exceed sixty (60) days; or to reject any and all the bids received and further advertise the project for bids. The base bid will be awarded to only one contractor. The City of Middleton may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject, for good cause, any or all bids upon the finding of the City it is in the public interest to do so. If you need more information regarding the project, contact Devin Krasowski, PE, Civil Dynamics, PC, devin@civildynamics.net

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.