Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 19, 2024

October 15, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$5,250,000.00

Public - City

img_map_placeholder

Multiple Locations, Madison, SD

64

22

5

6

Subscribe to View Full Documents

The Project includes the following Work: Site Clearing including Topsoil Stripping, Tree Removal and Tree Trimming; Concrete Sidewalk Removal and Replacement; Muck Excavation of Silt in Flood Control Channel; Remove Approximately 150 LF of Existing Rock Wall; Salvage approximately 1,350 SF of Stone Facing from Rock Wall; Approximately 458 CY of Unclassified Excavation; Install Approximately 5,130 SF of Steel Sheet Piling for Rock Wall Replacement; Install Approximately 150 LF of Concrete Retaining Wall; Install Approximately 160 LF of Stone Masonry Retaining Wall; Approximately 1,260 SF of Stone Masonry Refacing Approximately 805 SF of Stone Masonry Repair Install Approximately 210 CY of Structural Concrete for Wall Scour Protection Install Approximately 9,660 SF of Steel Sheet Piling for Wall Scour Protection Erosion and Sediment Control to Comply with the Project SWPPP Furnish and Install Seed, Fertilizer and Hydro-mulch on Approximately 1 Acre; Surface Restoration and all other miscellaneous work required not herein mentioned, but inferred from the construction Contract Documents The Bidder to whom the contract is awarded will be required to furnish a construction performance bond and a construction payment bond to the Owner in the amount of one hundred percent (100%) of the contract award for each bond, in conformance with the requirements of the Contract Documents. The construction performance bond and construction payment bond shall remain in full force until the completion of the Contract as specified in the General Conditions. All bids must be accompanied by a Bid security. Bid security will take the form of a bid bond in an amount of ten percent (10%) of the Bidder's maximum Bid price or a cashier's or certified check made payable to Owner in an amount of five percent (5%) of the Bidder's maximum Bid price. The Bid security will be retained by the Owner if the successful bidder refuses or fails to enter into an Agreement within fifteen (15) days after Notice of Award or fails at time of executing the contract to furnish a construction performance bond and construction payment bond guaranteeing the faithful performance of the work. Instructions to Bidders. Question Deadline 09/10/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Weston Blasius, PE Banner Associates, Inc. 1. Email: westonb@bannerassociates.com *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.