Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 11, 2024

October 31, 2025

Multiple Locations

Site Work

No Information to Display

$2,000,000.00

Public - County

img_map_placeholder

Multiple Locations, New Waterford, NS

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Capital Infrastructure Renewal Program for the 2024-25 construction season. a) Alexander Street (civic number 186 to end) The first component of this project involves installing approximately 130m of new water main with 150mm diameter pipe. This includes roughly 10 small-diameter residential services, one new gate valve, one fire hydrant and one connection to the existing 150mm water main extending to the end of the street. The existing 50mm galvanized pipe currently servicing the area will be abandoned. b) Ellsworth Avenue (Ling Street to MacNeils Lane) The second component of this project involves replacing approximately 425m of existing water main with new 200mm diameter pipe. This includes roughly 25 small-diameter residential services, eight gate valves, three fire hydrants and seven connections to existing water mains (includes side streets). The existing 150mm cast iron pipe currently servicing the area will be abandoned. c) Trunk 28 - New Waterford Highway (MacNeils Lane to Samuels Lane) project involves replacing approximately 375m of existing water main with new 200mm diameter pipe. This includes roughly 30 small-diameter residential services, seven gate valves, two fire hydrants and seven connections to existing water mains (includes side streets). The side street pipe diameter ranges from 50 to 200mm. The existing 150mm cast iron pipe currently servicing the area will be abandoned. TIMELINE: Planning and design services to commence shortly. Construction of projects a (Alexander Street) is planned for November, 2024; tender from general contractor is expected to be issued on October 8th. Timelines for tender and construction of projects b & c (Ellsworth Avenue & Trunk 28) to be determined. The two projects are expected to be carried out under one contract. *Budget is unreleased.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.