Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 27, 2024

September 30, 2024

September 30, 2025

Niles Road

Paving, Site Work

No Information to Display

$954,048.00

Public - City

img_map_placeholder

Niles Road, Green Bay, WI

57

14

2

8

Subscribe to View Full Documents

The work, in general, will include the approximate quantities and items listed below: Clearing and Grubbing - 0.10 acres Sawcut 300 If Excavation-450 Remove Culverts - 650 If Culvert Storm Sewer, 15"-36" HDPE-700 if Culvert Storm Sewer, 53'W x 41"H, CMP Pipe - Arch - 55 If Asphalt Pavement Pulverizing, 6-21,500 sy Crushed Aggregate Base Roadway - 2,160 cy Crushed Aggregate Base Shoulder and Driveways - 1,825 cy Hot Mix Asphalt Pavement, 3.5" - 21,500 sy Hot Mix Asphalt Pavement, Driveways 450 sy Riprap, Medium - 300 sy Traffic Control - 1 Is Pavement Markings, 4" Yellow - 17,000 If Topsoil, Turf, Grasses, and Erosion Mat - 29,235 sy Each proposal shall be accompanied by a certified check payable to the owner equal to five percent (5%) of the proposal or a bid bond of a bonding company duly authorized to do business in the State of Wisconsin in an amount equal to five percent (5%) of the proposal. This proposal guarantee shall be subject to forfeiture as provided by law. When submitting an electronic bid, Bidder is required to deliver the original certified check or bid bond within 72 hours of bid opening to Cedar Corporation. This project is part of a Local Road Improvement Program (LRIP) TRIS Program which consists of road improvements for an existing road, including clearing and grubbing, pulverize existing asphalt and base, excavation, storm sewer culverts, crushed aggregate base, hot mix asphalt pavement, and restoration. Proposals shall not be withdrawn for a period of 90 days after the date of opening. The Town of Eaton reserves the right to reject any or all of the proposals and to waive any informalities therein. Est. Completion Date: Aug. 30, 2025 Question Deadline 08/22/2024

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.