Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

March 31, 2025

September 17, 2025

To Be Determined

Renovation, Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

To Be Determined, Scarborough, ME

45

34

14

3

Subscribe to View Full Documents

Summary of Work: Demolish existing dewatering equipment including presses (2), conveyors and compressors; demolish polymer dosing equipment; install new centrifuge dewatering units (2) and appurtenances provided by the Owner; provide and install new polymer dosing equipment; provide and install new sludge conveyors (2); provide and install piping, valves, and other appurtenances to support the solids dewatering improvements; new yard piping for central discharge; temporary sludge handling/dewatering; provide and install HVAC, plumbing, and electrical improvements; provide and install monorail and hoist system for dewatering equipment; miscellaneous building improvements; and other work as shown on the Drawings. Duration: The Project has an expected duration of 280 days. Document notes: Bidding Documents may be examined at the Issuing Office on Monday through Friday between the hours of 8:00 AM and 5:00 PM. Electronic copies of Bidding Document will only be available and sent via electronic mail to the address on record with a hyperlink to download the documents in portable document format (PDF). In order to be qualified to submit a bid, General Contractors must request a set of electronic contract documents from Underwood Engineers, Inc. Contact Underwood Engineers at (603) 436-6192 or portsmouth@underwoodengineers.com, and provide the necessary contact information. Upon the Issuing Office's receipt of a request to receive bid documents, access to electronic documents will be sent to the prospective Bidder's email. Bid Bond: Bids must be accompanied by Bid security made payable to Owner in an amount of 5% of Bidder's maximum bid price and in the form required in the General Conditions. No bid may be withdrawn for at least 60 days after receipt of bids. Funding and Funding Provisions: This Project is not subject to federal funding requirements. Instructions to Bidders: For all further requirements regarding bids refer to the Instructions to Bidders. Question Deadline 09/03/2024 Questions: Direct questions regarding this to Underwood Engineers, Terry Desmarais, Senior Project Manager by email to tdesmarais@underwoodengineers.com or telephone at (603) 436-6192

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.