Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 11, 2024

October 11, 2024

April 29, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$448,940.00

Public - County

img_map_placeholder

Multiple Locations, Brunswick, GA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Question Submission Deadline August 23, 2024, 5:00pm The successful Bidder shall provide all skill; labor, material, and equipment for: North Harrington Project which consists of the construction of a new proposed 4-inch x 5-foot sidewalk. The work to be performed under this contract consists of the construction of Five-foot-wide concrete sidewalk down southern edge of North Harrington Drive beginning at Frederica Road intersection and running east to Harrington Lane. The work will include but is not limited to single lane closure traffic control, grading, crosswalk installation with signage, installation and maintenance of erosion and sediment control best management practices, sidewalk installation, backfill, dressing and grassing; 4th Street Sidewalk Project which consists of the removal of approximately 2,100 linear feet of existing sidewalk along Fourth street, and the construction of new proposed 8 foot wide sidewalk in-place and according to the construction plans and specifications provided herein. The work to be performed under this contract consists of furnishing all skill, labor, equipment, materials/products and performing all project coordination necessary to repair/replace the existing sidewalk to include installation of handicap ramps and crosswalk striping. The work will contain, but is not limited to, sidewalk construction, Demo, traffic control to include lane closures, clearing and grubbing, borrow, grading, backfilling , grassing, Striping and erosion control. All work shall be in accordance with the Technical Specifications and the construction drawings provided herein. All material shall conform to the specifications contained in the Technical Specifications. Bid Results North Harrington Sidewalk Project - Swindell Construction Company, Inc. - $216290 4th Street Sidewalk Project - Swindell Construction Company, Inc. - $232650

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.