Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

October 24, 2024

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Jurupa Valley, CA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The City will be installing 70 FCS throughout the City during Fiscal Year 2023-2024 in order to achieve a compliance milestone and to demonstrate progress towards 100 percent compliance with the Trash Amendments by 2030. The successful Contractor may be requested to install any number of devices. The City desires to receive a separate line item price for each catch basin insert by location in order to ensure that adequate funds are available. The City is desiring that each Contractor provide a design-build-install-warranty approach to each site. The City is requesting a lump sum price for each basin. The Contractor shall be responsible for making any necessary field measurements of each location in order to confirm dimensions and design/engineer the product to fit the specific location. Contractor shall provide all tools, materials and equipment in order to complete the installation. Any city infrastructure which may be removed must be replaced in like style, grade and condition so as to return the installation site to a pre-construction basis. Any damage to infrastructure caused by the Contractor shall be repaired at Contractors costs. Contractor shall begin installation of the devices 30-days from notice to proceed. Online Q&A Yes Q&A Deadline 09/16/2024 5:00 PM (PDT)

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects