Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2024

October 28, 2024

November 13, 2025

US-422

Paving, Site Work

No Information to Display

$14,574,877.00

Public - State/Provincial

img_map_placeholder

US-422, White Township, PA

288

13

40

7

Subscribe to View Full Documents

This Project is the Concrete Restoration to Include Slab Stabilization, Full Depth Slab Patching, Dowel Bar Retrofits, Guiderail Upgrades, Ramp Work, Bridge Structure Work, Crack and Joint Sealing, and Bituminous Binder and Wearing Resurfacing and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 0422, Section 405, in Indiana County, White, Center, and Armstrong Townships Along Us 422 in the Eastbound and Westbound Directions From Approximately the Sr 4422 (West Pike Road) Overpass Intersection at Segment 0134 Eb / 0145 Wb Offset 3450 Eb / 0162 Wb to the Bridge Carrying Us 422 Over Sr 4422 (Wayne Ave) and Sr 3035 (Old Us 119 Highway) at Segment 0214 Eb / 0215 Wb Offset 0612 Eb / 0612 Wb. This is the Lead Project to Companion Project Indiana Latex Group Mpms 117247 Which is the Bridge Preservation Activities and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 0422, Section 45d, in Indiana County Various Municipalities. Project Cost Range: $12,500,000.00 - $14,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 9.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Concrete Pavement Rehabilitation Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Indiana US 422 Bypass Repair *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

35 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects