Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 18, 2024

October 31, 2024

January 29, 2025

Bergfeld Ave

Site Work

No Information to Display

$240,000.00

Public - City

img_map_placeholder

Bergfeld Ave, New Braunfels, TX

27

8

2

6

Subscribe to View Full Documents

Reference Number 0000359794 CSP 24-037 Bergfeld In-Pipe Stormwater Filtration System Question Deadline 09/06/2024 at 5:00 PM CT Questions are submitted online Yes The Owner reserves the right to reject any and all bids and may reject a bid if a bidder does not acknowledge receipt of all addenda issued by the Owner Contractor and Owner recognize that time is of the essence of this Agreement and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.04.01 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration preceding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner $1285 for each calendar day that expires after the time specified in Paragraph 4.04.01 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner $1285 for each calendar day that expires after the time specified in Paragraph 4.04.01 for completion and readiness for final payment until the Work is completed and ready for final payment. Contractor shall complete all Work as specified or indicated in the Plans, Specifications and Contract Documents. The Work is generally described as follows: The City of New Braunfels seeks a bid for the facilities included with the BERGFELD AVENUE IN-PIPE STORMWATER FILTRATION SYSTEM All proposals shall follow the format provided by the City of New Braunfels. The City is seeking a construction company with quality experience in belowground water and stormwater utility work. Statement of Work: Demolition of portion existing Bergfeld Avenue within Right-of-Way Demolition of existing 60-inch stormwater pipe Construction of a two (2) new Pre-Cast Junction Boxes and associated appurtenances. Construction of a new Water Quality Vault and associated appurtenances. Construction of a In-Pipe Stormwater Filtration System and associated appurtenances Demolition and replacement of existing New Braunfels Utilities 4-inch Waterline and associated appurtenances. Replacement of existing Bergfeld Avenue Right-of-Way The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Installation of an In-Pipe Stormwater Filtration System, relocation of an existing New Braunfels Utilities Waterline and two (2) Pre-Cast Junction Boxes within a portion of existing Bergfeld Avenue Right-of-Way

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects