Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2024

September 16, 2024

May 1, 2025

8204 Alto Garden Dr

Site Work

No Information to Display

$80,000.00

Public - City

img_map_placeholder

8204 Alto Garden Dr, Dallas, TX

8

5

14

Subscribe to View Full Documents

As of Septmeber 25, 2024 this project was awarded to S&L Inc, but the awarded amount is not available. This contract will perform all the storm drain collection and concrete work outside the pool coping. Pleasant Grove City Public Works/Engineering Department, "City" is soliciting proposals from qualified contractors, "Proposer" to provide concrete flatwork and storm drain installation services. Over the past years the pool and surrounding concrete showed signs of settling. This settling caused concerns with the pools ability to filter properly. CEM Aquatics will be performing all the work directly related to the pool and the coping around the pool. Before CEM Aquatics can proceed with the coping and concrete curb connecting the pool wall and the concrete deck surrounding the pool, the first 5 ft of concrete flatwork surrounding the pool must be installed before September 30, 2024. This contract will perform all the storm drain collection and concrete work outside the pool, including the concrete deck up to the pool. The contractor will be able to perform this work on their schedule before May 1, 2025. Work may begin as soon as possible; however the critical path installation of other items installed by others are scheduled to be installed by the end of September will dictate when concrete surface can be placed outside of the first 5 ft from the pool. Question Deadline 08/13/2024

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.