Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2024

October 7, 2024

April 5, 2025

Multiple Locations

Site Work

No Information to Display

$602,750.00

Public - City

img_map_placeholder

Multiple Locations, Soper, OK

29

13

2

4

Subscribe to View Full Documents

for the SOPER OWRB ARPA SEWER LINE IMPROVEMENTS Funding for this project is provided through American Rescue Plan Act (ARPA) grant program. As such, compliance with Labor Standards Contract Provisions is mandatory. Compliance with the Davis Bacon Act is mandatory if the total project cost exceeds $10,000,000 (ten million dollars). All bids received at said time will be opened and evaluated for completeness and correctness. All work shall be performed, and all construction and materials used and furnished shall be in accordance with the Plans and Specifications prepared by PARKHILL, and on file in the office of 3300 Oklahoma Avenue, Suite 1100, Woodward, OK 73801. 2. Prospective Bidders are urged to register as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. Only Prospective Bidders who obtain Bid Documents through Parkhill will be registered as a document holder (plan holder) and will therefore automatically receive addenda if/ when issued. 3 . P a y m e n t shall be Company check or cashier's check made payable to Parkhill, or by credit card. 4. No partial sets will be issued. 5. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. Each bidder shall accompany his original bid, filed with the Town of Soper, with a certified or Cashier's Check on a solvent bank located in Oklahoma, or a Bidder's Bid Bond, in the amount of five (5) percent of the amount bid, as a guarantee of his ability to perform the contract bid upon, and that he will enter into a written contract with the Owner to perform said work and/or furnish said materials in accordance with said Plans and Specifications, and furnish the required bonds according to the Public Competitive Bidding Act of 1974. The Owner will retain the deposit for liquidated damages in case the successful bidder fails to enter in said contract and furnish the required bonds provided for in the specifications within the time required. Deposit of the unsuccessful bidders will be returned upon the execution of the Contract and required bonds. Construction, Maintenance and Statutory Payment Bonds in the amount of 100% of the contract price are required for this project. These bonds must be obtained from a Corporate Surety licensed in Oklahoma and approved by the Owner and Consulting Engineer. The bidder shall state in the proposal the name and address of the Surety or Sureties who will sign this bond in case the contract is awarded. The Maintenance Bond required will guarantee the repair of all damage due to improper materials or workmanship for a period of one (1) year after the acceptance of the work by the Owner. This project is to be financed by the ARPA grant program managed by the Oklahoma Water Resources Board (OWRB) and shall be referred to as Project No. ARP23-0113-G. The following requirements and regulations must be complied with: A. "Equal Opportunity in Employment: All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, age or physical handicap. If the total project cost exceeds $10,000,000 (ten million dollars) "Davis Bacon Act wage rules shall apply. All laborers and mechanics employed by contractors and sub- contractors on projects funded directly by or assisted in whole or in part by and through the Federal Government shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code and 29 CFR parts 1,3, and 5. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. The contract is to be awarded to the lowest, responsive, responsible bidder. The Owner reserves the right to correct any non-material clerical errors in the bidding as allowed under Oklahoma Law. The Owner reserves the right to reject any and all bids in accordance with the Oklahoma Public Competitive Bidding Act of 1974. Conditional bids shall not be accepted. 04194323.00

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit