Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2024

October 28, 2024

June 1, 2027

PA-73

Demolition, New Construction, Paving, Site Work

No Information to Display

$6,995,645.00

Public - State/Provincial

img_map_placeholder

PA-73, Skippack, PA

149

11

45

7

Subscribe to View Full Documents

The Description and Location of the Project is as Follows: This Project is for Replacement of the SR 0073 (Skippack Pike) Bridge Over Skippack Creek. The Replacement Bridge is a Two Lane, 104'-0" Long, Single-span Prestressed Concrete Bulb-tee Beam Structure With a Curb-to-curb Width of 40'-8" Consisting of Two 12'-0" Lanes and Two 8'-4" Shoulders. The Construction Also Includes Full-depth Replacement and Overlay and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 0073 Section Ms2, in Montgomery County, Skippack Township From Seg 0260 Off 2798 to Seg 0270 Off 1774. Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 44.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Skippack Pike over Skippack Creek - SR 73 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

34 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects