Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

November 18, 2024

July 1, 2026

1776 Militia Way SE

Renovation

No Information to Display

$7,909,000.00

Public - Federal

img_map_placeholder

1776 Militia Way SE, Salem, OR

135

38

110

6

Subscribe to View Full Documents

Owen Summers Readiness Center Seismic Upgrades Location- 1776 Militia Way SE Salem, OR 97301 Questions regarding the ITB must be made in writing to Sam Goff CPPB, via email to sam.a.goff@OMD.oregon.gov by the specified deadline in the ITB. Construction cost for bonding purposes only is estimated to be $11 million to $12.2 Million for Base Bid. Contractor shall employ Apprentices to perform 12 percent of the Work hours that workers in Apprenticeable Occupations perform under this Contract. This project consists of interior and exterior seismic upgrades which includes, but is not limited to, the addition of concrete shear walls and footings, steel bracing, concrete footing expansions and micropiles. Deconstruction and reconstruction of walls and staircases, relocation of interior doors and walls. Moving and relocating interior services including plumbing, electrical equipment, communications equipment, and HVAC equipment. Restroom fixture upgrades and restroom tile work to accommodate seismic upgrades. Complete Exterior Soffit replacement on the entire building, Roof repairs and replacement related to seismic upgrades. Exterior landscape repair and replacement affected by work described above and ADA compliance upgrades as required by local jurisdiction / *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project no - 224019, 230072

56 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.