Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 29, 2024

November 16, 2024

December 20, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$682,725.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Billings, MT

63

9

5

Subscribe to View Full Documents

Contract No. 05824 HSIP STWD(931): This project includes signing and delineation at sixteen sites within the Billings District. Work sites are within Big Horn, Carbon, Fergus, Golden Valley, Judith Basin, Musselshell, and Yellowstone counties. Sites 6 and 10 are within the Crow Indian Reservation. The site locations include the following: Site 1 - US-212 RP 63.700 to RP 67.290 wildlife signing S of Red Lodge. Site 2 - S-308 RP 1.000 to RP 5.790 wildlife signing E of Red Lodge. Site 3 - MT-72 RP 0.000 to RP 20.000 wildlife signing N and S of Belfry. Site 4 - S-314 RP 7.649 to RP 8.488 curve signing N of Decker. Site 5 - US-212 RP 90.000 to RP 90.471 curve signing near Boyd. Site 6 - S-418 RP 8.000 to RP 8.341 curve signing N of Pryor on the Crow Indian Reservation. Site 7 - River Rd. RP 1.600 to RP 2.500 signing and delineation S of Laurel. Site 8 - Shiloh Rd. RP 0.905 to RP 4.379 signing in Billings. Site 9 - Frontage Rd./Old Highway 87 RP 26.097 to 44.600 delineation W of Hardin. Site 10 - Frontage Rd. RP 0.000 to 10.132 delineation S of Hardin on the Crow Indian Reservation. Site 11 - MT-3/US-12 RP 142.329 to RP 142.820 signing and delineation W of Lavina. Site 12 - US-12 RP 146.100 to RP 157.800 delineation SW of Roundup. Site 13 - US-12 RP 160.100 to RP 166.995 delineation SW of Roundup. Site 14 - S-207/Benchland Rd. RP 4.965 to RP 21.831 signing and delineation N of Benchland. Site 15 - S-236 RP 12.503 to RP 12.661 curve signing N of Christina. Site 16 - US-191 RP 81.788 to RP 82.356 signing and delineation N of Roy. HSIP STWD(800): This project will address road departure crashes at two locations. The first location begins on US-12 4.5 miles west of Ryegate and ends just outside of Ryegate. Shoulder rumble strips will be added at this site. The second site is located at the intersection of MT-200 and the Truck Bypass on the west side of Lewistown. Signs, rumble strips, and a concrete splitter island will be added at this intersection. Contract to be completed as outlined in the Contract Time special provision found in the proposal. The Disadvantaged Business Enterprises contract goals are 0.00%. This project is under the jurisdiction of the Billings District Administrator. Uniform No. 10299000, 9911000 MT DOT - Call Order 202 - SF 209 Billings District Signs EC:BB:10299000ADV PID- 10299931000, 9911800000, 10299000, 99110000 MBE (3.3%), WBE (6.9%), DBE (0%)

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.