Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2024

September 30, 2024

January 1, 2025

Barnes Dr

Renovation

No Information to Display

$70,000.00

Public - City

img_map_placeholder

Barnes Dr, Levelland, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe to View Full Documents

South Plains College (SPC) invites qualified firms/individuals to submit Proposals for: Repainting Metals Technology Building South Plains College reserves the right to reject any or all bids and to waive any, and all formalities. SCOPE OF WORK: South Plains College wishes to contract with a qualified contractor to repaint interior of metal building as indicated in this proposal document. The primary and alternate proposals will be a lump sum price for all services as specified. The desired completion is between December 14, 2024 and January 1, 2025. Primary proposal will include specified areas of metal building. Alternate proposal will include primary proposal, along with remainder of interior building. The contractor will be responsible for verifying all measurements of needed materials, identifying all necessary preparation work and hazards before bidding. The contractor will be responsible for providing a barrier of safety highly visible to the public that would prevent a reasonable person from entering into the area. The Contractor will removal all debris and disposal off-site as specified in Section 3.02.9 and 10. Contractor will be responsible for keeping the work site clear of all debris at the end of each day

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects