Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 4, 2024

November 4, 2024

April 3, 2025

Florida A1A

Paving, Site Work

No Information to Display

$2,889,749.00

Public - State/Provincial

img_map_placeholder

Florida A1A, Flagler Beach, FL

57

7

6

Subscribe to View Full Documents

The Improvements under this Contract consist of milling and resurfacing, base work, drainage improvements, curb & gutter, sidewalk, traffic signals, and signing / pavement markings on State Road A1A from S 8th St to N 18th St approximately 1.798 miles in Flagler County. Counties: Flagler Road Name: SR A1A Limits: 73030000 Project(s): 44879515201(*) Federal Aid No: N/A Total Roadway Length: 1.798 Miles Contract Days: 150 Total Bridge Length: 0.000 Miles Contract Execution Days: 10 Total Proposal Length: 1.798 Miles Special Start Date: N/A Aquis/Flexible Start Time:0 The Improvements Under This Contract Consist of Milling and Resurfacing, Base Work, Drainage Improvements, Curb & Gutter, Sidewalk, Traffic Signals, and Signing / Pavement Markings on State Road A1a From S 8th St to N 18th St in Flagler County. Prequalification Required Question Deadline 08/28/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 003 - Resurfacing - SR A1A

48 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects