Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2024

October 22, 2024

December 1, 2025

4810 Marine Creek Pkwy

Renovation

No Information to Display

$3,060,534.00

Public - County

img_map_placeholder

4810 Marine Creek Pkwy, Fort Worth, TX

36

23

17

2

Subscribe to View Full Documents

Tarrant County College District (TCCD, the District, the College) is requesting bids to provide furniture and other goods for the Northwest Campus Renovation project. The objective of this IFB is to obtain the goods and services of qualified vendors to produce, deliver, and install furniture and other goods - delivered and installed - to Buildings NW02 & NW03 of the Northwest Campus Renovation project. The budget for this bid exceeds $4M. Project Overview a. The new construction scope will consist of four buildings totaling approximately 406,000 GSF. Building NW05 is a 3-story structure (approximately 88,500 GSF) that will include the Early College High School and Science Labs. Building NW01 is a three-story structure (approximately 135,000 GSF) that will include a Student Welcome Center, Registrar, Business Services, Financial Aid, Advising, and other related programs. Building NW03 is a two-story structure (approximately 55,000 GSF) that will include Visual Arts, Music, and Study areas. Building NW02 is a three-story structure (approximately 127,000 GSF) that will include a Theater, Dressing and Green Rooms, a Books Store, Multipurpose Room, Food Service, and a Dining area. b. Project and Scope of Work Overview: (1) Four New Buildings: (a) NW01 - approximately 135,000 SF - Complete Fall 2023 (b) NW05 - approximately 88,500 SF - Complete Summer 2023 (c) NW02 - approximately 127,000 SF - Coming Fall 2025 (d) NW03 - approximately 55,000 SF - Coming Summer 2025 c. Exterior spaces, including courtyards, will serve as an integral part of the concept design. The site scope is also inclusive of the redevelopment of the main access drive and the addition of landscaping, site lighting, sidewalks, and paved parking lot on the north and south sides of the campus. d. The above information is a high-level overview of the scope of work for the Northwest Campus Redevelopment project and is not intended to capture all items that are part of the construction documents. e. The furniture included in the scope of this IFB is being provided for ONLY Buildings NW02 and NW03 of the Northwest Campus Redevelopment project. Questions Due Date: Aug 20th 2024, 11:30 PM CDT Online Portal Bid Result - MillerKnol - WRG Texas - 478,680.50 Steelcase - Blue Box - 46,489.13 Task Chairs - NewTangram, LLC dba Tangram - 67,853.10 Workstations - wilsonbauhaus Interiors - 73,257.24 Classrooms - GL Seaman & Company - 655,587.12 Library - wilsonbauhaus Interiors - 334,001.39 Ancillary 01 - Intelligent Interiors, Inc - 490,945.95 Ancillary 02 - Facilitech Inc DBA Business Interiors - 280,631.12 Sofa-Pouf - Intelligent Interiors, Inc - 350,548.73 Storage - WRG Texas - 248,851.27 Exterior Furniture - Intelligent Interiors, Inc - 33,688.81

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.