Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 20, 2024

October 21, 2024

September 1, 2025

Powder River Ave

Paving, Site Work

No Information to Display

$1,395,877.00

Public - City

img_map_placeholder

Powder River Ave, Moorcroft, WY

20

14

4

6

Subscribe to View Full Documents

Installation of replacement water main including approximately 1,800 LF of 6" and 8" PVC water main, and associated fittings, appurtenances and service lines; the removal and replacement of pavement, concrete curb and gutter, and sidewalks affected by the project. The project area includes Powder River Avenue from Goshen Street to Converse Street. Question Deadline 08/09/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to the Engineer in writing. Oral and other interpretations or clarifications will be without legal effect. Address Questions to: HDR Engineering, Inc Attn: Noah Messick 601 Metz Drive, PO Box 457, Gillette, WY 82717 T: 307-228-6033 F: 307-228-6001 Email: noah.messick@hdrinc.com

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.