Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2024

October 7, 2024

April 25, 2025

High St

Site Work

No Information to Display

$209,441.00

Public - City

img_map_placeholder

High St, Holley, NY

19

15

4

6

Subscribe to View Full Documents

High St Waterline replacement Project The work generally consists of the installation of 1,400 lineal feet of new 8 inch diameter PVC waterline by open cut excavation; connections to existing water mains; removal and/or abandonment of existing waterlines & appurtenances; placing the new waterlines into service; and all other items in the Bidders Proposal. Service-Disabled Veteran-Owned Set Aside: No Total MWBE Participation Goals: 60% Service-Disabled Veteran-Owned Business Contracting Goal: 5% Disadvantaged Owned Sub-Contracting Goal: 5% Contract term: 07/30/2026 The Drawings, Specifications and Contract Documents under which the work is to be done are on file and may be examined at the office of Wendel WD Architecture, Engineering, Surveying & Landscape Architecture, P.C., 375 Essjay Road, Suite 200, Williamsville. New York 14221 and at the office of the Village of Holley Village Hall. SCOPE OF WORK The work to be done under this Contract includes the furnishing of all labor, materials, equipment and construction equipment necessary for the construction of the Project and in accordance with the drawings and specifications prepared by the Engineers, as set forth herein. All work obviously necessary for the completion of the contract shall be included, whether or not specifically shown or specified. The construction of the project, including the letting of contracts in connection therewith, will conform to applicable requirements of Federal, State and Local Laws, Ordinances, Rules and Regulations. The work shall include the installation of all materials required to complete the work whether furnished by the Contractor or the Owner. Should a bidder find discrepancies in or omissions from the Contract Documents, Drawings or Specifications, or should he be in doubt as to their meaning, he should at once notify the Engineer and request an interpretation thereof. Every request for such interpretation shall in writing addressed to Shannon Westoven (swestoven@wepdelcompanies.com) and Mackenzie Kennedy (mkennedy@wendelcompanies.com) and to be given consideration, must be received Wednesday, August 21, 2024 at 5 P.M

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects