Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 25, 2024

October 28, 2024

April 26, 2025

5997 Parkside Dr

Site Work

No Information to Display

$1,100,000.00

Public - County

img_map_placeholder

5997 Parkside Dr, Pleasanton, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe to View Full Documents

Requests for Information are due at 3:00 pm on Tuesday September 10, 2024 DESCRIPTION OF THE WORK. This project is a joint project between the District and the City of Pleasanton. The District is the sole contracting agency. The Work consists of, in general, drilling, constructing, developing, and testing up to three (3) test wells at up to three (3) different locations within the city of Pleasanton. The work includes but is not limited to, drilling up to three (3) 8-inch diameter exploratory borings to approximately 800 feet below ground surface at three different sites using a combination of casing-advance and mud rotary drilling methods, providing representative samples at a minimum of 5-foot intervals, preparing the holes for geophysical logging, reaming out a portion of the holes to 14-inch diameter, installing up t three (3) 8.625-inch minimum outside diameter (O.D) mild steel casing wells with specified screen intervals, developing the wells, and assisting with well testing at the direction of the District or the representative of the District. Submittal of progress reports to the project manager on a monthly basis is required. Contractor shall report the actual footage of materials used including well riser casing, screen, filter pack, bentonite, 10.3 sack cement at the conclusion of each site. Work also includes, but is not limited to: a. Contractor to contain all water and wastes generated as a result of the project and haul off site and dispose of in compliance with all laws and regulations including disposal at facilities that will accept the specific wastes. Contractor to provide all water, power, fencing, and sanitation facilities required to do the Work. b. Contractor shall furnish and install all new equipment as specified in the Contract Documents. Bidding Documents contain the full description of the Work. The Engineer's estimate for this Contract is approximately $1,100,000. CONTACT INFORMATION. Mailing address: Zone 7 Water Agency 100 North Canyons Parkway Livermore, CA 94551 Project Manager: Jacob Danielsen Telephone: (925) 454-5081 E-mail: jdanielsen@zone7water.com Work shall be finally completed within 180 Calendar Days from the date when Contract Time commences to run. The contract time is anticipated to commence on or about October 28, 2024

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.