Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 21, 2024

September 23, 2024

December 26, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$1,166,547.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Fort Bragg, NC

56

5

6

6

Subscribe to View Full Documents

Contract Id DF00478 WBS: 49218.9 & 49218.15 Federal Aid: State Funded Location: Fort Liberty Route: Collins St & Dunham St County: Cumberland Description: Resurfacing, Widening, Milling & Pavement Markings MBE / WBE 2.0% / 1.3% The North Carolina Department of Transportation is requesting bids for the project listed below. The date of availability for this contract is September 23, 2024. The interim completion date for this project is June 27, 2025. The completion date for this project is December 26, 2025. All prospective bidders shall be prequalified as a Bidder or PO Prime Contractor with the Department of Transportation prior to submitting a bid, in conformance with Article 102-2 of the 2024 NCDOT Standard Specifications. Contractors who are not prequalified may obtain information and forms for prequalifying from the Contractual Services Management Section of the Contract Standards and Development Unit, All required prequalification statements and documents shall be filed with the Contractual Services Management Section at least four weeks prior to the date of opening bids A Bid Bond (5%) is required in accordance with Article 102-10 of the 2024 NCDOT Standard Specifications. Contract Payment and Performance Bonds are required in accordance with Article 103-7 of the 2024 NCDOT Standard Specifications. Should you have questions, or need additional information, please contact Neil Butler, Division Proposals Engineer at jnbutler@ncdot.gov or Julio Williams, Assistant Division Proposals Engineer at jbwilliams7@ncdot.gov or either by phone at 910-364-0603. NCDOT - Resurfacing, Widening, Milling & Pavement Markings Question Deadline 08/14/2024

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects