Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 27, 2024

October 1, 2024

February 14, 2025

10 Humphrey St

Addition, Demolition, New Construction, Paving, Site Work

No Information to Display

$189,848.00

Public - City

img_map_placeholder

10 Humphrey St, Marblehead, MA

16

5

6

4

Subscribe to View Full Documents

Estimated Cost $141,000.00 Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. COA- Building addition - 10 Humphrey Street, Marblehead Mass This project includes: 1. The demolition of an existing three season structure including the foundation and a portion of the existing side walk. 2. Construction of a new approximately 13'x29' one story structure & modifications to the opening from the existing structure 3. Other work as shown in these drawings. A minority employee workforce hour goal of 10 percent. 2. A woman employee workforce hour goal of 6.9 percent. 3. A goal of 8.25 percent participation of minority-owned business enterprise. 4. A goal of 2.09 percent participation of woman-owned business enterprises. SCOPE OF WORK/LOCATION OF WORK: 2.1 The work shall consist of: 1.) The demolition of an existing three season structure including the foundation and a portion of the existing sidewalk. 2.) Construction of a new approximately 13'x29' one story structure & modifications to the opening from the existing structure 3.) Other work as shown in these drawings Attachment A - Sample Contract Attachment B - Prevailing Wage Attachment C - Specifications Attachment D - Drawings 2.2 The work includes furnishing all labor, materials, equipment and incidentals for completing the work as specified or reasonably implied by trade practice, as determined by the Owner. 2.3 The OWNER reserves the right to eliminate elements of the work or parts of sections, as may be determined by them as a basis of award, to keep within the limits of available funds, and/or add to sections of the work previously eliminated The demolition of an existing three season structure. Construction of a new 13'x29' one story structure & modifications to existing building Question Deadline Aug 13, 2024

46 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.