Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 30, 2024

December 29, 2024

September 25, 2025

100 8th Ave SE

Site Work

No Information to Display

$2,700,000.00

Public - State/Provincial

img_map_placeholder

100 8th Ave SE, St Petersburg, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

St. Petersburg Chiller Plant Replacement. All work performed on this project shall be done in accordance with all the Contract Documents referenced, attached to the MyFloridaMarketPlace Vendor Information Portal (MFMP VIP) advertisement, and contained herein, including those documents received as a result of the submission of the Confidentiality Exemption Form (Attachment A). See Exhibit 2 in the Terms and Conditions for pricing breakdown. The purpose of this Invitation to Bid (ITB) is to obtain competitive pricing for the replacement of Chiller #3 and related pumps. Additionally, we will connect to the new building automation system, per plans and specifications, in accordance with the contract documents and Chapter 255 of the Florida Statutes. Deadline for Questions Must be received PRIOR to: October 17, 2024 @ 5:00 PM ET On projects where the base bid and sum of all additive alternates exceeds $100,000.00 the bid shall be accompanied by a bid guarantee (bid bond) of not less than five (5) percent of the amount of the bid. Contractor shall furnish the Owner’s Contract/Project Manager with a 100% Performance Bond and 100% Labor and Material Payment Bond for any contracts in excess of $100,000 and shall be written by a Surety Company acceptable to Owner and authorized to do business in the State of Florida and signed by a Florida Licensed Resident Agent. Contractor is required to furnish replacement bonds in the event of cancellation of the original Performance Bond and Labor and Material Payment Bond Documents may include but are not limited to: o Any Modifications o Agreement (Exhibit 1 in the Terms & Conditions) o Addenda o Terms and Conditions o Invitation to Bid o Drawings and Specifications o Permits The Commission has an estimated budget for this project of $2,700,000. LOCATION: 100 Eighth Avenue SE, St. Petersburg, FL 33701 In accordance with the General Terms and Conditions, the number of days from Notice to Proceed with Construction to Substantial Completion shall be two hundred and seventy (270) calendar days and Final Completion shall be thirty (30) calendar days thereafter. The mobilization day will be at the discretion of the Contract/Project Manager.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.