Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

November 13, 2026

3535 Somerset Dr

Site Work

No Information to Display

$400,000.00

Public - County

img_map_placeholder

3535 Somerset Dr, Prairie Village, KS

117

31

183

5

Subscribe to View Full Documents

Bidding documents will be shipped only if the requesting party assumes responsibility for all related charges. Corporate, certified, or cashier's checks shall be made payable to Drexel Technologies, Inc. Bidders shall submit with their bid a bid bond issued by a surety company licensed to do business in the State of Kansas in the amount of five percent (5.0%) of the total amount of their bid. Said guarantee shall be made payable to the Board of County Commissioners of Johnson County, Kansas. Contact Information The Work is generally described as: Rehabilitation and capacity upgrades to the Dykes Branch Pump Station: Demolition of existing wet weather pumps, and; Demolition of existing mechanical bar screen, and; Demolition of identified electrical and controls components, and; Demolition of identified piping, valves and fittings, and; Installation of new mechanical, electrical and plumbing systems, and; Installation of new piping, valves, and fittings, and; Installation of a new mechanical bar screen and a new washer compactor, and; Installation of three (3) new submersible, solids handling pumps, and; Installation of new electrical gear, and; Installation of a new generator, and; Construction of a new dumpster canopy. Installation of a new skylight system, and; Identified improvements to the exterior of the facility, including roof, loading dock, and doors About Remove letter accents tool WORK BY OTHERS A. R.E. Pedrotti (REP) 1. REP is responsible for furnishing and installing a new radio tower at the Dykes Branch Pump Station. REP is responsible for the design of the foundation for the antenna, furnishing any ancillary components including any anchors for the tower, and erecting the tower. The CONTRACTOR for the Dykes Branch Pump Station Improvements project shall coordinate with REP on the timing of this installation. 2. REP is responsible for the following scopes of work related to controls: a. Supply PLC and PLC cabinet. b. Install all internal components. c. Provide initial programming and programming support during commissioning and startup. B. K&W Underground 1. K&W Underground will be responsible for the following scopes of work: a. Provide and install fiber in the conduit supplied by others. b. Install a patch panel in the contractor provided fiber panel. Question Deadline 09/12/2024 at 4:00 PM CT

28 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects