Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 18, 2024

November 18, 2024

November 18, 2025

To Be Determined

Site Work

No Information to Display

$2,770,800.00

Public - Federal

img_map_placeholder

To Be Determined, Pierre, SD

1

12

5

6

Subscribe to View Full Documents

This requirement will be for stabilization of the Emergency Spillway upstream channel by excavation and shaping of the existing shoreline soil materials, installation of geotextile fabric, and the placement of riprap stone protection.The solicitation, specifications and drawings are provided below in the attachments section. Details of the site visit on 29 August 2024 are listed within the solicitation. BIDDER'S QUESTIONS AND COMMENTS Bidders must submit questions and comments relative to the bidding documents via Bidder Inquiry as indicated below. Bidders may submit questions and comments relative to any proprietary concerns or bidding documents, or if the Bidder Inquiry system is out of service, to the individuals below: Contract Specialist - Primary POC: Wayne C. Weidenhamer wayne.c.weidenhamerusace.army.mil Contracting Officer - Secondary POC: Nadine Catania Nadine.L.Cataniausace.army.mil BIDDER INQUIRY Bidders shall submit all questions via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet/, ten calendar days before bid opening, to allow the government time to respond before receipt of bids or issue an amendment. Technical inquiries and questions relating to technical requirements, bidding procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at: https://www.projnet.org/projnet/ No Later Than 4pm Central Time on 9 September 2024 , in order that they may be given consideration or actions taken prior to receipt of offers. Phone calls for non-technical or procedural type questions should be made between 8:30 a.m. and 3:30 p.m. (Central Standard Time) Monday through Friday. The Bidder Inquiry system is to be used to ask and receive answers to all non-proprietary questions. An organized site visit has been scheduled for-- August 29, 2024 at 10:00am (Central Time) Participants will meet at-- Oahe Administration Building 28563 Powerhouse Rd. Pierre, SD 57501 THE MAGNITUDEOF CONSTRUCTION IS BETWEEN $5,000,000 and $10,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (7.9%), WBE (6.9%), SBE (100%)

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.