Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

November 25, 2024

November 14, 2025

4350 Springtree Dr

Renovation

No Information to Display

$7,179,000.00

Public - City

img_map_placeholder

4350 Springtree Dr, Sunrise, FL

22

23

32

8

Subscribe to View Full Documents

Springtree Water Treatment Plant Electrical Upgrades - Phase 2. The Contractor Must Have Successfully Completed at Least Three (3) Projects of Similar Type, Size and Complexity Within the Past Ten (10) Years and Provide Verifiable References for These Projects. The City Shall Be the Sole and Final Judge in Determining if the Contractor Meets the Qualification Requirement. The City Does Not Tolerate Discrimination in Any of Its Programs, Services or Activities; and Will Not Exclude Participation in, Deny the Benefits of, or Subject to Discrimination Anyone on the Grounds of Real or Perceived Race, Color, National Origin, Sex, Gender Identity, Sexual Orientation, Age, Disability/handicap, Religion, Family or Income Status. In Compliance With the Ada and F.s.s. 286.26, Any Individual With a Disability Requesting a Reasonable Accommodation in Order to Participate in a Public Meeting Should Contact the Citys Ada Coordinator at Least 48 Hours in Advance of the Scheduled Meeting A Description of the Project is as Follows: Scope of Work: Work for This Project Consists of, but is Not Limited to, Replacement of the Existing Medium Voltage Main Switchgear and Medium Voltage Motor Control Centers With New 5kv Medium Voltage Switchgear; Installation of New 5kv Generator Paralleling and Load Sharing Switchgear and Associated Controls to Parallel the Existing Generators, Synchronize Them With Each Other, and Interconnect With the Electrical Utility; Upgrade of Existing Standby Generator Mechanical Components and Controls; Provision of Temporary Electrical Connections, Equipment, and Sequencing of Electrical Work to Ensure Continuous Operation of the Facilitys Electrical System Throughout the Construction Phase; Removal and Replacement of Three Vertical Turbine High Service Pumps, Along With Associated Above-grade Discharge Piping, and the Performance of All Labor, Work and/or Other Operations as Required for the Fulfillment of the Contract in Strict Accordance With the Contract Documents. Location: Springtree Water Treatment Plant, 4350 Springtree Drive, Sunrise, Fl 33351 Qualification Requirement: the Contractor Shall Have Any of the Following: State of Florida Certified General Contractors License and/or Florida Certified Electrical Contractors License. pre bid meeting notes. Contractors Are Responsible for Bringing Any Required Sub-contractors to This Mandatory Pre-bid Conference and to the Mandatory Site Visit. This Site Visit Conducted by the City Will Be the Only Time Contractors Will Be Granted Access to the Site. Bid Bond 5% Question Deadline 08/29/2024 at 12:00 PM ET The Engineer/Budget/Project Estimate is approximately $6,900,000.00 for this project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

68 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.