Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 21, 2024

No Information to Display

311 Park Dr

Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

311 Park Dr, Buffalo, MO

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

For furnishing all labor, materials, and equipment and performing all work necessary to install a new U-Fuel 4000 gallon, 2 product, Box Station with dispenser and point of service system and associated improvements, such as concrete pads, bollards, and utilities, required to provide a functioning system. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the current version of the Missouri Standard Specifications for Highway Construction including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. No bid will be considered unless accompanied by a certified check or cashier's check on any bank or trust company insured by the Federal Deposit Insurance Corporation, payable to the City of Buffalo, for not less than five (5) percent of the total amount of the bid, or by a bid bond secured by an approved surety or sureties, payable to the owner, for not less than five (5) percent of the total amount of the bid The successful bidder will be required to furnish separate performance and payment bonds each in an amount equal to 100% of the contract price at the time of contract execution. The owner has established a contract performance time of 90 calendar days from the date of the Notice-to-Proceed. All project work shall be substantially completed within the stated timeframe. This project is subject to liquidated damages as prescribed in the project manual. The owner reserves the right to select any one of the combinations of the base bid(s) and alternate bid(s), which in the judgment of the owner, best serves the owner's. interest. The right is reserved, as the City of Buffalo may require, to reject any bid and all bids. MODOT - Buffalo Municipal Airort (H17)

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects