Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 28, 2024
September 30, 2024
November 20, 2025
17 Institute Dr
Renovation
No Information to Display
$1,881,438.00
Public - State/Provincial
17 Institute Dr, Concord, NH
County : Merrimack Scope of Work: Remove and replace existing energy recovery air ventilation handling unit an associated filtration box assembly, controls, filters, plenum, supply and return ductwork that serve the range. Equipment and range area to be remediated and remove all lead contamination prior to work. Proposal Guarantee: 5% of bid amount Description: This project will include removal and replacement of the existing energy recovery air handling unit (ERU) an associated air filters, housing box / plenum, supply and return ductwork that serve the firing range. Remove corridor access panel for filter box access and replace to match in kind. Remove and replace ERU, an associated rooftop equipment, ductwork. Before work may start, all areas shall be thoroughly remediated to remove all lead contamination. This includes the shooting range duct work, all surfaces and properly disposed. The Project will include the Discipline(s) of: Metals, Wood and Plastics, Thermal and Moisture Protection, Finishes, Controls, Equipment, Mechanical, Electrical Bidders Should Act Promptly and Submit All Questions in Writing to Gary Brown, Fax 603/271-3515, E-mail Gary.f.brown@das.nh.gov in Accordance With Explanation to Bidders - Instructions T O Bidders, Document 00204 - Part 13. All individuals, firms, partnerships or corporations intending to bid, before obtaining plans and specifications, must file with the Department of Transportation on forms prepared for that purpose at least ten (10) days prior to opening of bids, a statement showing their qualifications. No valid bidding proposal will be issued to a prospective bidder who is not qualified Project completion date is 11/20/2025 Bidders must submit a 5% bid security at Bid and must furnish a 100% payment and performance security prior to execution of contract. The right is reserved to waive any informalities in or to reject any or all proposals. NHDOT - ARPA Ventilation & Filtration Upgrades/Replacement Police Standards & Training
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Concord, NH
Bid Date: Oct 07 2024
Concord, NH
Bid Date: Sep 25 2024
Concord, NH
--
Concord, NH
Bid Date: Sep 26 2024
Concord, NH
Bid Date: Oct 04 2024
Concord, NH
Bid Date: Sep 10 2024
Concord, NH
--
Concord, NH
Bid Date: Jan 10 2024
Concord, NH
Bid Date: Nov 17 2020
Concord, NH
Bid Date: Oct 20 2023
Concord, NH
Bid Date: Oct 20 2023
Concord, NH
Bid Date: Nov 14 2023
Concord, NH
Bid Date: Oct 18 2023
Concord, NH
Bid Date: Oct 18 2023
Concord, NH
Bid Date: Oct 18 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
