Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 17, 2024

November 18, 2024

November 3, 2025

To Be Determined

Site Work

No Information to Display

$37,428,500.00

Public - Federal

img_map_placeholder

To Be Determined, New Orleans, LA

41

26

13

6

Subscribe to View Full Documents

New Orleans To Venice, Non-Federal Levee Mitigation Project, Fritchie Marsh, St. Tammany Parish, LA. This is an UNRESTRICTED procurement. NAICS code is 237990. The work consists of wetland restoration in existing shallow open water area via borrow dredging from a designated borrow pit within Lake Pontchartrain. Material will be placed within the marsh creation area to the desired project marsh elevation. The work requires construction of retention dikes, surveys, and all operations incidental thereto. Degrading of dikes and additional excavation will be required after construction of the marsh platform has been finalized. **************************************************************************************************************************************************** Amendment 0001 - Magnitude of work changed to between $10,000,000 and $25,000,000. **************************************************************************************************************************************************** Amendment 0002 - Duration revision from page 32 of solicitation package. The correct duration is 350 days total (255 days for Base Work and 95 days for Optional Work). The magnitude of construction is between $25,000,000 and $100,000,000. Question submission deadline is Friday, 23 August 2024 at 2:00 p.m. local time.. Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed Complete the entire work not later than 260 calendar days after the date of receipt by him of notice to proceed. The time stated for completion shall include final cleanup of the premises. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects