Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2024

November 4, 2024

November 28, 2025

To Be Determined

New Construction, Site Work

No Information to Display

$40,845,000.00

Public - City

img_map_placeholder

To Be Determined, Splendora, TX

385

93

91

4

Subscribe to View Full Documents

A New Greenleaf Elementary School Thursday, August 22, 2024 @ 2:00 p.m. C.S.T. - Deadline for written requests for clarifications to the RFP or Construction Documents. Project Team: The selected Respondent will join a Project Team which will include Owner Administration, Program Manager and Architect/Engineer, all of whom will be engaged in a cooperative effort to provide the Owner with successful and cost-effective solutions for Greenleaf Elementary school project. Project Information: The Owner plans to build a new two-story elementary school, approximately 127,850 sf for approximately 1,000 students. The new elementary school will be located at 24050 Bright Sunshine, Splendora, Texas 77372. The Project may include the following general scope items: 1. Tree protection, site utilities, cement concrete paving 2. Foundation 3. Structural frame 4. Metal fabrications 5. Face brick veneer 6. Metal wall panels 7. Aluminum, glass and window wall 8. PVC Roofing 9. Interior walls 10. Tile, resilient flooring, sheet carpeting, resinous athletic flooring 11. Suspended plaster, suspended drywall, lay-in panels, sound absorbing units 12. Steel doors and frames, wood doors, Kynar coated storefront, overhead coiling doors 13. Casework 14. Specialties 15. Hydraulic elevators 16. Automatic sprinkler system 17. Plumbing systems 18. HVAC Systems and building automation 19. Electrical, telecommunications systems, telephone systems, lightning protection and emergency power 20. Fire detection, alarm and emergency call systems Budget $40,845,000. The value of the Owner furnished equipment for Package #1 is $1,067,940 The substantial completion date is November 28, 2025.

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects