Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 5, 2024

October 28, 2024

No Information to Display

511 Oak St

Paving, Site Work

No Information to Display

$50,934.00

Public - City

img_map_placeholder

511 Oak St, Minonk, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

As of September 23, 2024, this project has not yet been awarded. A timeline for award has not yet been established. oRemove approximately 68' segment of existing concrete steps and sidewalk and properly dispose of all construction waste material. oPrepare subgrade by tamping or rolling until thoroughly compacted and at the proper line and grade. oSecurely place forms for new concrete sidewalk 68' x 9' x 5'' thick, 2 steps 68' long with 7" riser and 12" run, and 4' wide ADA compliant ramp. oFurnish and install #4 rebar in steps and wire mesh in sidewalk and ramp. oInstall approximately 9' x 68' x 5" IDOT Class SI concrete sidewalk. Concrete shall have a minimum thickness of 5" or match existing if greater. Joint spacing shall match existing oInstall 4' wide IDOT Class SI concrete ADA ramp and handrail. The ramp will be two sided, approximately 6' long on each side of 5' landing at building entrance. oInstall 68' of IDOT Class SI concrete steps. oRemove approximately 8' x 68' of brick and concrete road in front of new steps and replace with 6" thick IDOT Class PP concrete pavement. oBid needs to allow for gravel fill under sidewalk. All concrete must be 4,000 psi mix, broom finished and seals with cure and seal. Material testing shall be provided by the Contractor. The work shall be in accordance with Standard Specifications for Road and Bridge Work in Illinois, Current Edition. Please call City Hall and ask for Bill Moline 309-432-2558 or visit site for visual on what is needed.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.