Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

November 4, 2024

October 6, 2025

Multiple Locations

Outdoor Lighting, Paving, Site Work

No Information to Display

$54,444,444.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Las Vegas, NV

586

15

249

4

Subscribe to View Full Documents

Question Deadline 08/26/2024 at 4:00 PM PT Type: District-3 Contract Cost Range: R36 ($34,000,000.01 to $41,000,000) Funding Type: Federal Opening Office: Carson City Project No(s): NHP-STBG-0032-(235) County(s): White Pine Enterprise Goal: 5.8 % Location: US 50, Aultman Street, 1st Street to Bell Avenue and US 93, East Aultman Street, 10th Street to 15th Street Work Description: complete streets restripe, roadway reconstruct, curb, gutter, sidewalk, bike lanes, ADA, drainage, lighting, sewer and water improvements Project Manager: Shawn Paterson Designer: Walters, Michael Resident Engineer: Samar, Jonathan Milepost(S): WP 9.01 to 10.34 and WP 17.67 to WP 18.23 Contract Days: 240 (Working) Liquidated Damages: $8,000.00 All proposals must be accompanied by a proposal guaranty (bid bond or other guaranty) made unconditionally payable to the Nevada Department of Transportation in the amount equal to 5% of total bid amount. The guaranty may be cash, cashiers check, certified check, money order, bank draft, an undertaking executed by a corporate surety company authorized to do business in the State of Nevada, an electronic bid bond validated with Surety 2000 or Sure Path, or any other guaranty that may be especially approved by the Department. NVDOT - Roadway Reconstruct, Curb, Gutter, Sidewalk, Bike Lanes, Ada, Drainage, Lighting, Sewer and Water Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.