Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 7, 2024

October 7, 2024

October 30, 2024

225 E River Rd

Renovation

No Information to Display

$428,000.00

Public - City

img_map_placeholder

225 E River Rd, Brainerd, MN

9

14

12

6

Subscribe to View Full Documents

PD Exterior Improvement Project. Description: This project consists of some exterior renovations, including but not limited to, window and door replacement, EIFS repair, and roof replacement. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement.. Each bid must be accompanied with a cashier's check, bid bond, U.S. Government Bonds (at par value) or certified check equal to five percent (5%) of the amount of the proposal. Security is payable to the Owner as a guarantee of prompt execution of the contract in accordance with the proposal and Contract documents, along with furnishing Payment and Performance Bonds of One Hundred percent (100%) of the bid amount acceptable to the Owner. Bids received after the deadline will be returned unopened. Bids are to be submitted on the Bid Form provided in the project manual. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor. Bids may not be withdrawn within forty-five (45) days after the scheduled closing time for receiving bids without consent of the Owner. The Owner reserves the right to reject any and all bids and rebid the project until a satisfactory bid is received. No bid will be read or considered if the bid does not fully comply with the requirements of this invitation and/or other bidding and contract documents. Any deficient bid submitted will be resealed and returned to the bidder immediately.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects