Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 13, 2024

November 30, 2024

8 Syracuse St

Renovation

No Information to Display

$600,000.00

Public - State/Provincial

img_map_placeholder

8 Syracuse St, Baldwinsville, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

This Project Shall Include, but Not Be Limited to Delivery of Installation of Manual Transfer Switch. A Description of the Required Equipment and Supporting Services and Details Are Located in the Rfp on Nypa's Ariba Platform. A Subsidiary of the New York Power Authority (Hereafter, "Nypa" and/or "the Authority") is Seeking Qualified Firms to Provide Installation of Manual Transfer Switch. Incomplete Proposal Responses May Be Rejected. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 0% Women Owned Sub-Contracting Goal: 0% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Disadvantaged Owned Sub-Contracting Goal: 0% Contract term: Less than 1 year Location: Lock E-34 8 Syracuse Street, Baldwinsville, NY 13027 Installation of a new manual transfer switch in accordance with drawings E-1 and E-101, and E-102, Final Drawing dated April 24, 2024 from Argus Engineering, PLLC. b. The contractor will provide all materials and means necessary to complete the work by the scheduled deadline. c. The contractor will submit a projectspecific health and safety plan, and work plan per the project documents prior to start of work. d. The contractor shall refer to Construction Permit No 18-54, for requirements and conditions e. Obtain a NYSCC Work Permit prior to starting construction. f. Submit as-build drawings including any revisions to the original signed/sealed drawings g. Coordinate with Argus Engineering via NYSCC if any discrepancies to the drawings arise during construction. h. Coordinate independent electrical inspection with NYSCC at points referenced in the construction permit.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects