Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 20, 2024

September 19, 2024

November 14, 2024

Bellflower St

Site Work

No Information to Display

$544,100.00

Public - City

img_map_placeholder

Bellflower St, Adelanto, CA

11

8

3

Subscribe to View Full Documents

The work to be done as described in the Special Provisions entitled Adelanto Road Water Main Improvement Project, This project generally consists of constructing a 2" grind and overlay per bid schedule and additive bid schedule. This project is located on Bellflower Street between Chamberlain Way and Air Expressway. Bids must be accompanied by a Bidder's Bond in the form of a certified or cashier's check or a corporate surety bond in an amount not less than ten percent (10%) of the bid amount. Prior to execution of the Contract, the successful bidder shall provide one-hundred percent (100%) Faithful Performance and one-hundred percent (100%) Payment bonds based on the bid amount accepted by the City. There will not be a pre-bid conference scheduled for this project. The work under this contract shall be diligently prosecuted to completion. Required submittals shall be presented for approval within 10 working days from notice of award. Subsequent re-submittals shall be presented within 5 working days. All materials shall be placed and work completed before expiration of the 40 WORKING DAYS from notice to proceed. The Contractor shall pay the City of Adelanto the sum of $1,000.00 per day for each and every calendar day delay in finishing the work in excess of the contract time period of Forty 40 WORKING DAYS as Liquidated Damages. Engineer's Estimate for the Base Bid is approximately 814,069.00 Engineer's Estimate for the Additive Bid is approximately 54,258.00 All contractors shall be licensed with Class A in accordance with the laws of this state, and any contractor not so licensed shall be subject to the penalties imposed by such laws. Contractor shall possess the appropriate license prior to award of Contract. The contractor and subcontractors, prior to start of work, shall obtain a City of Adelanto Business License. The City of Adelanto reserves the right to accept or reject any and all bids and to award a Contract to the bidder who best meets its requirements. Question Deadline 08/14/2024 at 3:00 PM PT Any prospective bidder desiring an explanation or interpretation of the solicitations, specifications, etc., must request it in writing to the Purchasing Division

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects