Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

November 18, 2024

October 14, 2025

2144 Oakland Rd

Renovation, Site Work

No Information to Display

$9,700,000.00

Public - County

img_map_placeholder

2144 Oakland Rd, San Jose, CA

93

37

13

8

Subscribe to View Full Documents

Estimated Amount: $10,000,000.00. The Work will consist of: o Demolition Work. o Site Grading and Site Improvement. o Providing security fence and associated site work. o Interior Improvement Work o Providing wire mesh partitions in the warehouse areas, including doors & gates. o Providing workstations at offices, open office, and in the warehouse area, including worktables and chairs. o Exterior Improvement Work o Providing loading dock equipment and warehouse accessories, including parking bumpers, bollards, guard rails, column protectors, door rail protectors and door operators o Providing security fence and associated site work. o Structural o Providing concrete pads, foundations, slabs on grade, retaining walls, and other associated structural work. o Mechanical o Providing roof top exhaust fan, rooftop air conditioning unit, humidifiers, and associated HVAC work. o Electrical and Low Voltage o Providing lighting and power on the interior and exterior warehouse area, and other associated electrical work. o Providing data cables, Wi-Fi access waypoint, card readers and all other associated low voltage work. o Plumbing o Providing pipes, fittings, valves, drain and all other accessories for all plumbing modifications/ improvements, and all other associated plumbing work. o Fire Protection Providing fire alarm system and fire sprinkler modifications/improvements. o Permits o Contractor to include allowance for obtaining railroad permit and associated insurance costs. o Equipment o Contractor to furnish Yale MR16N Forklift model will need to have the 3 stage 334" lift capability or equivalent o Contractor to assume that all soil is to be off hauled to class II facilities . The Contract Time for the completion of all the Work of the Project is 330 calendar Days from the Commencement Date in Owner's Notice to Proceed. Designated portions of the Work must be completed according to the following Milestones. Question Deadline 09/09/2024 at 5:00 PM PT PN - 21.222.1, 220320.00, 422060

82 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.