Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 21, 2024

June 29, 2026

8900 State Line Rd

Site Work

No Information to Display

$12,455,101.00

Public - County

img_map_placeholder

8900 State Line Rd, Leawood, KS

172

35

51

5

Subscribe to View Full Documents

The Force Main Project (2024-029) consists of the following Work: Installation of approximately 17,750 feet of 20-inch and 24-inch diameter sanitary sewer force main (pipe and fittings furnished by Owner) and appurtenances generally from 8900 State Line Road to the Tomahawk Wastewater Treatment Facility; installation of approximately 800 lineal feet of 10-inch diameter gravity sewer; installation of approximately 307 lineal feet of 24-inch steel casing pipe and 480 lineal feet of 42-inch steel casing pipe by auger boring; installation of four (4) gravity manholes ranging in diameter from 4-foot to 6-foot; installation of ten (10) new combination air release valve assemblies in vaults; construction of a 12-foot by 19-foot cast-in-place concrete pigging station including valving; stream restoration of Indian Creek in two (2) locations; sodding and seeding of disturbed unpaved areas including restoration of soccer fields and park ground in Leawood Park and replacement of disturbed fencing and vegetation in the Leawood Dog Park; installation of approximately 15,000 feet of new 2-inch conduit and associated pull boxes (for a future fiber optic system by others); placement of flowable fill backfill of the gravity and force main under paved areas; full depth replacement of two southbound asphalt lanes of State Line Rd, a single lane of State Line Way, a single lane of 109th Street, mill and overlay of turning lanes on State Line Road, and miscellaneous pavement with quantities of 5,315 tons of KCMMB A1 asphalt, 551 tons of KCMMB A2 asphalt, 8,474 tons of KCMMB A3 asphalt, and 26,829 SY of AB-1 aggregate base; replacement of 3,681 lineal feet of curb and 182 SY of median pavers; replacement of 3,861 SY of concrete pavement and sidewalk; traffic control and permitting necessary to conduct work on existing roadways; installation of Type III Microsurfacing of two (2) northbound lanes of State Line Road from 89th Street to 103rd Street; temporary facilities; and all other appurtenances, labor, and materials. Question Deadline 08/30/2024 at 5:00 PM CT Questions received less than 09 days prior to the bid opening date may not be answered. ALL questions shall be directed to the Johnson County Purchasing Administrator: Megan Wasek (Megan.Wasek@jocogov.org / 913-715-0591).

37 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.